| |
Handy Boiler Room Estimates and Facts
- One boiler horsepower requires .069 GPM of water.
- Steam per hour divided by 500 gives GPM of water required.
- A reduction of 40°F in the stack temperature increases efficiency by
about 1%.
- Every 11°F added to the feedwater prior to going into the boiler increases
the efficiency by 1%.
- 1/8" scale build-up can increase fuel consumption up to 4%.
- 1/8" soot build-up can increase fuel consumption up to 8%.
- Cost for a 1/2" steam leak at 100 PSIG could cost as much as $65,000 per year.
- For boiler room ventilation, allow a minimum of one (1) square inch for
every 10,000 BTU/Hr. input.
- Flue gas breeching should be designed for approximately 5,000 ft./min.
velocity.
- Acceptable flue gas velocity in stack is a minimum of 2,400 FPM and a
maximum of 3,600 FPM
Need more information or have questions about boiler room requirements? Just call us at 1-800-BOILERS and our experienced sales people will ensure you get exactly what you need for maximum efficiency and safety. |